Pipe Support Smart Assist
by Lovable Engineering - MSS - ASME B31.3
Project: Not selected
Active Line NPS: 6"
Start
Home
Workflow
1 - Project Context2 - Selection Wizard3 - Recommendation4 - Structure & Linking5 - Review Inputs6 - Support Register7 - Material Take-Off
Library & Help
Support StandardsCodes & ReferencesUser ManualAbout & ReleasesEULA & Disclaimer
Decision support tool - v1.0
About & Releases loaded
Loaded project

No project selected

Choose a project on Home or enter project inputs to begin.

Working copy
Unsaved changes

About

Pipe Support Smart Assist · Engineering decision-support tool

What it does

Pipe Support Smart Assist guides piping engineers through pipe support selection with explicit traceability to ASME B31.3 and MSS standards. It is purpose-built for fast, defensible screening during FEED, detailed design and brownfield revamps.

Outputs include a primary recommendation, alternates, design and follow-up checks, allowed/restrained movements, risk flags and a project-level register and MTO.

See the User Manual, the Codes & References, and the EULA.

Release Notes
v1.0.0
2026-05-03 Initial Release
  • Engineering decision wizard for pipe support selection
  • Project Inputs with sample data, save/load, JSON import/export
  • Recommendation engine with verdicts, risk flags and code references
  • Support register and screening MTO
  • Codes & References library (ASME B31.3, MSS SP-58/69/89/127, PFI ES-26)
  • EULA, disclaimer banner and user manual
Feedback
Report defects, request dataset updates or send feedback through your project channel. Always validate outputs against the latest approved revision of governing codes.
Built with Lovable Engineering

For engineering support only. Final support design shall be reviewed and approved by a qualified piping engineer against project specifications, stress analysis, structural capacity, applicable codes (ASME B31.3, MSS SP-58/69/89/127, PFI ES-26) and client standards. This software is a decision-support tool and does not replace professional engineering judgement.

ProjectWizardReportRegisterMTO

Before you continue

Review the quick how-to-use guide, user manual summary and EULA/disclaimer before using Pipe Support Smart Assist.

  1. 1

    Confirm the project context

    Enter the project, area, line number, pipe size, schedule, material, service and operating basis before using the wizard.

  2. 2

    Run the selection workflow

    Use the wizard to describe orientation, nearby features, movement strategy, uplift, vibration and constructability limits.

  3. 3

    Review the recommendation

    Check the primary support, alternates, restrained movements, risk flags, learning note and code references before adding it to the register.

  4. 4

    Build the deliverables

    Assign supports to structures, review inputs, manage the support register and generate the screening MTO for project review.

  5. 5

    Save project records locally

    Choose a local records folder so each project is archived as reloadable app data plus CSV/TXT files that remain readable outside the app.

Open the EULA tab and scroll to the end to enable acceptance.