Skip to main content
Pipe Support Smart Assist
by Lovable Engineering - MSS - ASME B31.3
Project: Not selected
Active Line NPS: 6"
Start
Home
Workflow
1 - Project Context2 - Selection Wizard3 - Recommendation4 - Structure & Linking5 - Review Inputs6 - Support Register7 - Material Take-Off
Library & Help
Support StandardsCodes & ReferencesUser ManualAbout & ReleasesEULA & Disclaimer
Decision support tool - v1.0
1 - Project Context loaded
Loaded project

No project selected

Choose a project on Home or enter project inputs to begin.

Working copy
Unsaved changes

Local project records

Save each project to a local folder. The app writes a reloadable app-project.json plus CSV/TXT records for long-term access if the app is unavailable.

Workflow steps are links. Blocked steps are skipped until required earlier work is complete.

Step 1 of 7
Define project, line and area data.
Project Context
Define project, line and area data.
1/7
  1. 1Project ContextContextcurrent
  2. Support SelectionSelectcomplete
  3. 3RecommendationRecommendavailable
  4. 4Structure & LinkingStructureavailable
  5. 5Review InputsReviewavailable
  6. 6Support RegisterRegisteravailable
  7. Material Take-OffOutputblocked

Project Inputs

Capture the design basis. These inputs drive every recommendation downstream.

Project Management
Project Line List & Support Index

Use this when the same line number appears in multiple physical sections. Supports added while this row is active are tied to that section.

No project lines yet. Load a sample scenario, add the current line, import a CSV, or paste a line list.
Project
Line
Add at least project name and line number.Next: Support Selection

For engineering support only. Final support design shall be reviewed and approved by a qualified piping engineer against project specifications, stress analysis, structural capacity, applicable codes (ASME B31.3, MSS SP-58/69/89/127, PFI ES-26) and client standards. This software is a decision-support tool and does not replace professional engineering judgement.

ProjectWizardReportRegisterMTO

Before you continue

Review the quick how-to-use guide, user manual summary and EULA/disclaimer before using Pipe Support Smart Assist.

  1. 1

    Confirm the project context

    Enter the project, area, line number, pipe size, schedule, material, service and operating basis before using the wizard.

  2. 2

    Run the selection workflow

    Use the wizard to describe orientation, nearby features, movement strategy, uplift, vibration and constructability limits.

  3. 3

    Review the recommendation

    Check the primary support, alternates, restrained movements, risk flags, learning note and code references before adding it to the register.

  4. 4

    Build the deliverables

    Assign supports to structures, review inputs, manage the support register and generate the screening MTO for project review.

  5. 5

    Save project records locally

    Choose a local records folder so each project is archived as reloadable app data plus CSV/TXT files that remain readable outside the app.

Open the EULA tab and scroll to the end to enable acceptance.