No project selected
Choose a project on Home or enter project inputs to begin.
Structures
A structure (Goal Post, Inverted L, Pedestal, Pipe Rack Beam, Existing Steel) carries one or more pipe supports. Pipe supports (function + hardware) are then created in the Recommendation tab and assigned to a structure.
Default for Goal Post (Portal Frame): 4. Override allowed.
Pipe CL - foundation/top-of-steel
Pipe group width + 2 x side clearance
| Component | Material | Qty | Size |
|---|---|---|---|
| Vertical Post | ASTM A36 | 2 | W8x31 / HSS6x6x3/8 |
| Top Beam | ASTM A36 | 1 | W8x31 |
| Base Plate | ASTM A36 plate | 2 | PL 350x350x20 |
| Anchor Bolt Set | ASTM F1554 Gr.55 | 2 | M20 (4 nos.) |
Multiple supports on a single structure require combined load verification by structural design. Preliminary sizes shown here assume one governing support; reactions from all attached supports must be summed in the final check.
No structures yet — add one above.
A goal post or inverted L is a structure, not a pipe support type. The pipe still rests on a shoe or is restrained by a U-bolt; the structure simply carries that hardware. Pipe supports reference a structure ID — multiple supports may share one structure, but structural quantities count once.